Our group’s masterplan that was presented in week four used our main concepts from week three’s schematic masterplan. As a group we worked very hard, where the end result was a schematic concept design for two schools (sustainability and industrial) including the conference center.


We faced many challenges in regards to the site levels and the level of the bender. Working in section and three-dimensionally was very difficult because it was hard to grasp the concept of working with different ground levels and different floor levels. Building a form model of our individual sections for next week is going to be very interesting, as it represents how the building will work three-dimensionally and how it relates to the different ground levels, the bender and the building around it.